Friday, December 20, 2019
Finished or Not Friday 12/20/19
Last week, I showed progress on my Winter QAL. This week I can show you that I have the rows together. I did have a couple of little issues with some points. I unpicked a few, resewed and they are better. Some are just going to have to be "not perfect".
I did not measure this quilt top. But Mr Busy is 6'1" ( he has shrunk a bit as he has gotten older) is standing on a dining room chair and holding it up!
And my Bow Tie quilt is complete, except for a label.
A pieced backing, lots of strips to make a binding and finally done. It is washed now and all wonderfully crinkly!
I'm linking up with Alycia for Finished or Not Friday!
Stay Busy and Stay Happy
(it gonna be busy and I hope happy here)
Friday, December 13, 2019
Finished or Not Friday WQAL 2019
Seems I have a lot of “not Finished “! Here is yet another one. Right hand 1/2.
Left hand 1/2. You can see my orange sticky notes marking "Hour 4" and Upper Left Hand corner. I make myself notes, a lot!
I decided to join Alycia’s winter quilt along because ...... I could! I had a blue left over from backing 2 Christmas wall hanging that were donated to the local library silent auction. I had a cream piece that was purchased a long time ago, that was looking for a place to shine and the yardage needed for the other contrast, I chose red, was a small star fabric that looked great with the rather true blue!
My steps took longer than the 1 hour , Alycia managed. But definitely not difficult and definitely fun. The way she chose to lay out the HST and the few solids in 4 rows for 10 blocks each was easy!
So Hour 3 and Hour 4 are sewn together. Hour 5 is on the design wall. I am hoping to get that step done today. Then I just have 2 seams to get to quilt top or flimsy stage.
My design wall is just barely big enough.
There is grocery shopping and Christmas tree decorating on my agenda too. But Mr Busy has a cold, so getting the tree down out of the attic space over the garage could be postponed! Wish me luck!
I'm linking up with Alycia's Finished or Not Friday!
Stay Busy and Stay Happy
Saturday, December 7, 2019
A SNAFU of the "scrappy" sort!
While I am looking forward to Christmas, my sewing mojo had taken a nosedive. I’m trying to decide what to do for RSC20. Thinking about UFOs to get on a list, etc.
My OMG for December was delivered to the quilter before Thanksgiving. She was in MN to spend the holiday with her younger son and family. The weather caused them to be delayed getting back home.
She was able to start to get my quilt on the long arm and discovered a problem . My backing was too small!! OMG, I am so embarrassed! Luckily she is a dear friend and lives close. So yesterday I picked up my bag if pieces and parts. I couldn’t figure out how that had happened. Then I found the note I had written to her. It said, the quilt is square, 48 x 48! And the backing and batting are pieced to be 56 x 56. The requested 4” larger on each side, should be good , right!
Well my quilt is nor 48 x 48, as you can tell!
It's rectangular, 48 x 64! It had been a while since I finished it. And I thought the sticky note with the dimension was for the bow tie quilt! Wrong!!!!
My news year’s resolution will be to have a notebook/ journal where I keep the data on each finish!
Ok, lesson learned! (At least we will hope so!)
I did not have enough of the backing fabric but found a maroon and cream gingham that looks alright. No creative piecing either. Just git it done! It's going to be a picnic quilt to carry in the car!
I had to add 13 inches!
A close up, that doesn’t look so muted! I had to cut a new batting piece also. Luckily I had a twin size batt in my closet,
It will go back to Lynn tomorrow And she will get it done. I’ll probably use the leftover original backing scraps for binding. Let’s see, 48 + 48 + 64+64+12” = 236! Add it again, write it down with details, Judy!! Go!
I am linking this post to Scrap Happy Saturday.
And Finished or Not Friday (cause it's definitely a NOT)
And Oh Scrap ( cause I uttered a work that rhymes with scrap when Lynn called me about my booboo)
For those of you who are tired of seeing my Bow Tie quilt, I apologize.
Stay Busy and Stay Happy
Tuesday, December 3, 2019
Dec OMG Goal
This is a photo of my Bow tie quilt top. It was one of the blocks I did for RSC19 at So Scrappy. It is at the quilters now. She promised to have it done for me before she left to go south to AZ for Christmas and the following 4 months. She will, I am sure. So I will prep a binding. My goal is to have the binding on the quilt by New Year’s Eve.
It's a small goal, but there may be a snafu in there. We will see. Our granddaughter and her husband and 2 kids will be moving in with us at the end of Dec. It’s a long story as to the why. I’ll spare you the details. It will only be for about 60 days.( we hope) We only have 2 bedrooms, it will be cozy. But my quilting and hand sewing time will be limited. J is at school M-F and Miss B goes to pre school in the afternoons, M-TH, so there will be those times. I haven't learned yet how to sew with littles around. These 2 are so curious and so busy!
You may get to hear me rant a bit or at least vent. I'll apologize in advance.
I am linking this post with Patty's Goal Setting Link Up.
Stay Busy and Stay Happy
Friday, November 29, 2019
November OMG complete
My November goal was to catch up to current, my temperature quilt.
I have October attached to the main part of the quilt , complete with dividing black sashing.
Thanks to Mr Busy for holding it outside for a photo. The temps are dropping as I write this.
November row is done up to today. Actually, yesterday, because we are expecting a lot of snow and wind, so who knows what the low will be at midnight. I wait til morning to check the previous day.
So my November OMG is complete. Hooray!
I'm linking up with Patty's Finish post and starting to think about an OMG for December! ?????
Stay Busy and Stay Happy
Monday, November 25, 2019
Oh Scrap! Garlic Knots
I got the last of the 88 garlic knots done. I counted on Friday, I was one short! So I quickly cut and stitched one more. This morning I took down the blocks that were on my design wall ( donations blocks for CiL) and started to put up Garlic Knots. Mr Busy is still asleep, the cat woke me at 5:20AM!
I'm setting them at 8 X 11! I took them bundle by bundle. I thought I had 10 in each bundle and then 8 more. But, I made 91!! Three extra!.. Better than not enough!
You can see I have a TOO DARK one in the middle! Glad I had a few extra! And above the dark one, up 2 rows is a multi colored one that I don't really like now! REPLACED! And to the right of the multi colored one is one that I used 2 different neutrals. Not happy with it either!
I replaced the 3 I really did not like. And I see some light ones that need to be changed around.
| sorry for the indoor pictures. i can't get far enough away from my design wall to get a decent photo! |
I will live with these for a day or two, change a few and then take them down in stacks so I can web them together.
ps: my scrap bins are not any emptier!!!!!!!
Linking to Oh Scrap!
Stay Busy and Stay Happy
and Happy Thanksgiving to all in the USA. Happy Week to other around the world friends.
Friday, November 22, 2019
Not Finished and some Finished
So now you see Not Finished! I 'll show some quilts from a recent quilt show that ARE finished.
Halloween quilts
This was a panel I think, the quilting was fabulous!
The colors and the piecing in this one were amazing!
We are in Wyoming! There must be wildlife.
Quilts of Valor, too!
My friend Connie won a people's choice for this log cabin beauty!
There were birds and bats.
And bit and bobs!
351 quilts in all!
There are quilters in my community that FINISH!
I'm linking with Alycia at Finished or Not Friday!
Stay Busy and Stay Happy
Subscribe to:
Posts (Atom)































